Files
claude-plugins/infraestrutura/skills/vm-migration/SKILL.md
Emanuel Almeida 6b3a6f2698 feat: refactor 30+ skills to Anthropic progressive disclosure pattern
- All SKILL.md files now <500 lines (avg reduction 69%)
- Detailed content extracted to references/ subdirectories
- Frontmatter standardised: only name + description (Anthropic standard)
- New skills: brand-guidelines, spec-coauthor, report-templates, skill-creator
- Design skills: anti-slop guidelines, premium-proposals reference
- Removed non-standard frontmatter fields (triggers, version, author, category)

Plugins affected: infraestrutura, marketing, dev-tools, crm-ops, gestao,
core-tools, negocio, perfex-dev, wordpress, design-media

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-12 15:05:03 +00:00

4.2 KiB

name, description
name description
vm-migration Migracao zero-downtime de workloads CWP e EasyPanel para VMs Proxmox com safety nets e rollback procedures.

VM Migration

Migracao zero-downtime de workloads CWP e EasyPanel para Proxmox VMs seguindo Migration-Plan-OptionA com safety nets e rollback procedures.

Quando Usar

  • Migrar servidores CWP para VMs Proxmox
  • Migrar containers EasyPanel para VMs Proxmox
  • Executar Migration-Plan-OptionA (3 fases)
  • Migracao phased com validation periods

Quando Nao Usar

  • Migracoes non-CWP/EasyPanel (criar plan especifico)
  • Ambientes teste/dev (menos rigor)
  • Single-server setups (nao cluster)

Sintaxe

/vm-migration <source-type> <source-host> [--phase 1|2|3] [--batch-size 5] [--validate-days 7]

Exemplos

# Fase 1: EasyPanel migration (batch 5 containers)
/vm-migration easypanel easy.descomplicar.pt --phase 1 --batch-size 5

# Fase 2: CWP migration com 7 dias validation
/vm-migration cwp server.descomplicar.pt --phase 2 --validate-days 7

# Fase 3: Apenas confirmar (sem migracao)
/vm-migration finalize --phase 3

Knowledge Sources (Consultar SEMPRE)

mcp__notebooklm__notebook_query \
  notebook_id:"276ccdde-6b95-42a3-ad96-4e64d64c8d52" \
  query:"proxmox migration cwp easypanel docker lxc zero downtime"

Hub Docs: Hub/05-Projectos/Cluster Descomplicar/Planning/Migration-Plan-OptionA.md


Migration-Plan-OptionA Overview

Timeline: 8 semanas | Strategy: Phased migration com safety nets | Rollback: Disponivel em cada fase

Week 1-2: FASE 1 - EasyPanel Migration
+-- Backup EasyPanel -> PBS
+-- Create Docker VM Proxmox
+-- Migrate containers (batch 5-10)
+-- DNS cutover gradual
+-- Validation + Rollback window

Week 3-6: FASE 2 - CWP Migration
+-- 7 dias safety net (server intacto)
+-- Create AlmaLinux 8 VM
+-- Migrate CWP accounts (batch)
+-- Validate sites + email
+-- DNS cutover (TTL 300s)
+-- Rollback ate Day 7

Week 7-8: FASE 3 - Cluster Formation
+-- Prepare server.descomplicar.pt as Node A
+-- Form cluster (pvecm)
+-- Configure HA groups
+-- Live migration tests
+-- Cleanup legacy servers

Workflow Pre-Migration (Todas Fases)

1. Backup Strategy Validation

# Verificar PBS configurado
pvesm status | grep pbs

# Criar backup point actual
vzdump --storage pbs-main --all 1 --mode snapshot

Garantir 3-2-1 compliance: original + PBS Node B + PBS Node A remote sync.

2. Documentar Estado Actual

# CWP: Listar contas
/scripts/list_accounts > /tmp/cwp-accounts.txt

# EasyPanel: Listar services
curl -s http://localhost:3000/api/trpc/projects.list | jq > /tmp/easypanel-services.json

# DNS TTLs (baixar para 300s ANTES de migration)

3. Comunicar Clientes (se downtime esperado)

  • Email 48h antes
  • Status page update
  • Janela de manutencao agendada

Fases Detalhadas

Fase Detalhes Referencia
Fase 1: EasyPanel (Week 1-2) 108 containers Docker -> VM Proxmox references/fase1-easypanel.md
Fase 2: CWP (Week 3-6) 39 vhosts CWP -> VM AlmaLinux 8 references/fase2-cwp.md
Fase 3: Cluster (Week 7-8) 2-node cluster, HA, cleanup references/fase3-cluster.md
Troubleshooting Problemas comuns e resolucao references/troubleshooting.md

Backup Strategy Resumo

Fase Locais Backup RPO RTO
Fase 1 Original + PBS + VPS 1h 2-4h
Fase 2 Server intacto + PBS + /mnt/migration/ 1h 2-4h
Fase 3 Node A + Node B + PBS dual 1h 2-4h

Anti-Patterns

Anti-Pattern Risco Alternativa
Migrar tudo de uma vez Downtime total Batches de 5-10
Nao baixar TTL antes DNS lento a propagar TTL 300s 24h antes
Apagar server antigo cedo Sem rollback Manter 7 dias
Sem backup pre-migration Perda dados vzdump + 3-2-1

References

  • Migration Plan: Hub/05-Projectos/Cluster Descomplicar/Planning/Migration-Plan-OptionA.md
  • NotebookLM: 276ccdde-6b95-42a3-ad96-4e64d64c8d52
  • Guia Hub: Guia-Definitivo-Proxmox-Hetzner.md (Modulo 4: Workloads)
  • Desk CRM: Projecto #65, Tarefa #1712