📋 TASKS: Quality Fixes breakdown + CHECKLIST
- Converted tasks.md to focus on quality assurance fixes
- 13 executable tasks across 4 phases
- Parallel optimization saves 55 minutes
- Agent specialization for each task type
- Production readiness validation included
- CHECKLIST.md with real-time progress tracking
Ready for Master Orchestrator automation 🎛️
This commit is contained in:
@@ -1,196 +1,202 @@
|
||||
# 📋 TASKS BREAKDOWN - desk-moloni
|
||||
# 📋 TASKS BREAKDOWN - desk-moloni Quality Fixes
|
||||
|
||||
## 🎯 CURRENT SPRINT: Web Interface Development
|
||||
## 🚨 CURRENT SPRINT: QUALITY ASSURANCE & PRODUCTION READINESS
|
||||
|
||||
### 🔄 IN PROGRESS - Phase 2 Implementation
|
||||
### PHASE 1: CRITICAL SYNTAX FIXES (P1) 🔥
|
||||
- [ ] **T001**: Fix syntax error in ClientSyncService.php:450
|
||||
- **File**: `modules/desk_moloni/libraries/ClientSyncService.php`
|
||||
- **Issue**: Missing semicolon after `$contact['alternative_email'] ?? ''`
|
||||
- **Estimate**: 5 min
|
||||
- **Priority**: CRITICAL
|
||||
- **Agent**: php-fullstack-engineer
|
||||
- **Acceptance**: PHP syntax error resolved, file validates with `php -l`
|
||||
|
||||
#### 2.1 Web Dashboard Development (Priority: HIGH)
|
||||
- [ ] **T001**: Design dashboard wireframes and UX flow
|
||||
- **Estimate**: 4h
|
||||
- **Assignee**: Emanuel Almeida
|
||||
- [ ] **T002**: Fix switch case syntax in SyncWorkflowFeatureTest.php:262
|
||||
- **File**: `tests/feature/SyncWorkflowFeatureTest.php`
|
||||
- **Issue**: Incorrect syntax in switch statement `case 'seasonal_bulk_sync',`
|
||||
- **Estimate**: 10 min
|
||||
- **Priority**: CRITICAL
|
||||
- **Agent**: dev-helper
|
||||
- **Dependencies**: None
|
||||
- **Acceptance**: Wireframes approved, user flow documented
|
||||
- **Acceptance**: Test file syntax validates, no PHPStan errors
|
||||
|
||||
- [ ] **T002**: Implement authentication system
|
||||
- **Estimate**: 8h
|
||||
- **Assignee**: Emanuel Almeida
|
||||
- **Dependencies**: T001
|
||||
- **Acceptance**: Login/logout working, session management
|
||||
- [ ] **T003**: Run comprehensive PHPStan analysis for remaining syntax errors
|
||||
- **Command**: `./vendor/bin/phpstan analyse . --level=5`
|
||||
- **Estimate**: 15 min
|
||||
- **Priority**: HIGH
|
||||
- **Agent**: development-lead
|
||||
- **Dependencies**: T001, T002
|
||||
- **Acceptance**: All critical syntax errors identified and documented
|
||||
|
||||
- [ ] **T003**: Create main dashboard interface
|
||||
- **Estimate**: 12h
|
||||
- **Assignee**: Emanuel Almeida
|
||||
- **Dependencies**: T002
|
||||
- **Acceptance**: Dashboard shows sync stats, real-time status
|
||||
### PHASE 2: ENVIRONMENT SETUP (P2) ⚙️
|
||||
- [ ] **T004**: Install missing PHP extensions [P]
|
||||
- **Extensions**: `php8.3-dom`, `php8.3-mbstring`, `php8.3-xml`, `php8.3-xmlwriter`
|
||||
- **Commands**: System-level package installation
|
||||
- **Estimate**: 15 min
|
||||
- **Priority**: HIGH
|
||||
- **Agent**: system-development-agent
|
||||
- **Dependencies**: None
|
||||
- **Acceptance**: PHPUnit executes without extension errors
|
||||
|
||||
- [ ] **T004**: Implement real-time monitoring
|
||||
- **Estimate**: 6h
|
||||
- **Assignee**: Emanuel Almeida
|
||||
- **Dependencies**: T003
|
||||
- **Acceptance**: Live updates via AJAX/WebSockets
|
||||
- [ ] **T005**: Fix namespace issues in library files [P]
|
||||
- **Files**:
|
||||
- `modules/desk_moloni/libraries/Encryption.php` (line 18)
|
||||
- `modules/desk_moloni/libraries/EntityMappingService.php` (line 21)
|
||||
- **Issue**: Namespace declaration not first statement
|
||||
- **Estimate**: 20 min
|
||||
- **Priority**: HIGH
|
||||
- **Agent**: php-fullstack-engineer
|
||||
- **Dependencies**: None
|
||||
- **Acceptance**: Files comply with PSR-4, autoloading works correctly
|
||||
|
||||
#### 2.2 Configuration Management (Priority: HIGH)
|
||||
- [ ] **T005**: Build API credentials management
|
||||
- **Estimate**: 6h
|
||||
- **Assignee**: Emanuel Almeida
|
||||
- **Dependencies**: T002
|
||||
- **Acceptance**: CRUD for API keys, secure storage
|
||||
- [ ] **T006**: Fix namespace issues in test files [P]
|
||||
- **Files**:
|
||||
- `modules/desk_moloni/tests/contract/ConfigTableTest.php` (line 16)
|
||||
- `modules/desk_moloni/tests/contract/MoloniApiContractTest.php` (line 10)
|
||||
- **Issue**: Namespace declaration positioning
|
||||
- **Estimate**: 15 min
|
||||
- **Priority**: MEDIUM
|
||||
- **Agent**: dev-helper
|
||||
- **Dependencies**: None
|
||||
- **Acceptance**: Test files validate, proper namespace structure
|
||||
|
||||
- [ ] **T006**: Create field mapping interface
|
||||
- **Estimate**: 10h
|
||||
- **Assignee**: Emanuel Almeida
|
||||
- **Dependencies**: T005
|
||||
- **Acceptance**: Visual field mapper, save/load configs
|
||||
### PHASE 3: STRUCTURE & COMPLIANCE (P3) 📁
|
||||
- [ ] **T007**: Create missing assets directory structure [P]
|
||||
- **Action**: Create `/assets/` directory with standard subdirectories
|
||||
- **Structure**: `assets/{css,js,images,fonts}/`
|
||||
- **Estimate**: 5 min
|
||||
- **Priority**: MEDIUM
|
||||
- **Agent**: system-development-agent
|
||||
- **Dependencies**: None
|
||||
- **Acceptance**: Production readiness validator passes directory check
|
||||
|
||||
- [ ] **T007**: Implement sync settings panel
|
||||
- **Estimate**: 4h
|
||||
- **Assignee**: Emanuel Almeida
|
||||
- **Dependencies**: T005
|
||||
- **Acceptance**: Configure batch sizes, frequencies
|
||||
- [ ] **T008**: Fix PSR-4 autoloading compliance [P]
|
||||
- **Files**: All test classes not following PSR-4 standard
|
||||
- **Action**: Adjust class paths or update autoloading configuration
|
||||
- **Estimate**: 15 min
|
||||
- **Priority**: MEDIUM
|
||||
- **Agent**: php-fullstack-engineer
|
||||
- **Dependencies**: None
|
||||
- **Acceptance**: Composer autoload warnings eliminated, performance improved
|
||||
|
||||
#### 2.3 Error Management & Monitoring (Priority: MEDIUM)
|
||||
- [ ] **T008**: Build error dashboard
|
||||
- **Estimate**: 8h
|
||||
- **Assignee**: Emanuel Almeida
|
||||
- **Dependencies**: T003
|
||||
- **Acceptance**: View/filter errors, retry failed operations
|
||||
- [ ] **T009**: Update composer.json PHP version requirement [P]
|
||||
- **File**: `composer.json`
|
||||
- **Change**: Update `"php": "^8.4"` to `"php": "^8.3"` (already done)
|
||||
- **Estimate**: 2 min
|
||||
- **Priority**: LOW
|
||||
- **Agent**: dev-helper
|
||||
- **Dependencies**: None
|
||||
- **Acceptance**: Composer validates without PHP version conflicts
|
||||
|
||||
- [ ] **T009**: Implement alert system
|
||||
- **Estimate**: 6h
|
||||
- **Assignee**: Emanuel Almeida
|
||||
- **Dependencies**: T008
|
||||
- **Acceptance**: Email/SMS alerts for critical errors
|
||||
### PHASE 4: VALIDATION & TESTING (P4) ✅
|
||||
- [ ] **T010**: Execute comprehensive PHPStan validation
|
||||
- **Command**: `./vendor/bin/phpstan analyse . --level=5`
|
||||
- **Target**: Zero syntax errors, maximum quality score
|
||||
- **Estimate**: 10 min
|
||||
- **Priority**: HIGH
|
||||
- **Agent**: development-lead
|
||||
- **Dependencies**: T001-T009
|
||||
- **Acceptance**: PHPStan reports 0 critical errors
|
||||
|
||||
- [ ] **T010**: Create sync operation logs viewer
|
||||
- **Estimate**: 6h
|
||||
- **Assignee**: Emanuel Almeida
|
||||
- **Dependencies**: T003
|
||||
- **Acceptance**: Searchable log interface with filters
|
||||
- [ ] **T011**: Validate PHPUnit environment
|
||||
- **Command**: `./vendor/bin/phpunit --version`
|
||||
- **Target**: PHPUnit executes without extension errors
|
||||
- **Estimate**: 5 min
|
||||
- **Priority**: HIGH
|
||||
- **Agent**: dev-helper
|
||||
- **Dependencies**: T004
|
||||
- **Acceptance**: PHPUnit ready for test execution
|
||||
|
||||
#### 2.4 Reporting & Analytics (Priority: MEDIUM)
|
||||
- [ ] **T011**: Design reporting interface
|
||||
- **Estimate**: 4h
|
||||
- **Assignee**: Emanuel Almeida
|
||||
- **Dependencies**: T003
|
||||
- **Acceptance**: Report templates, date range selectors
|
||||
- [ ] **T012**: Run production readiness validation
|
||||
- **Script**: `./scripts/production_readiness_validator.sh`
|
||||
- **Target**: All critical checks PASS
|
||||
- **Estimate**: 10 min
|
||||
- **Priority**: HIGH
|
||||
- **Agent**: security-compliance-specialist
|
||||
- **Dependencies**: T001-T011
|
||||
- **Acceptance**: Production validator reports READY status
|
||||
|
||||
- [ ] **T012**: Implement sync performance analytics
|
||||
- **Estimate**: 8h
|
||||
- **Assignee**: Emanuel Almeida
|
||||
- **Dependencies**: T011
|
||||
- **Acceptance**: Charts showing performance metrics
|
||||
- [ ] **T013**: Generate final quality report
|
||||
- **Action**: Document all fixes applied and final status
|
||||
- **Output**: `QUALITY_FIXES_REPORT.md`
|
||||
- **Estimate**: 15 min
|
||||
- **Priority**: MEDIUM
|
||||
- **Agent**: content-manager
|
||||
- **Dependencies**: T001-T012
|
||||
- **Acceptance**: Complete documentation of quality improvements
|
||||
|
||||
- [ ] **T013**: Add export functionality (CSV/PDF)
|
||||
- **Estimate**: 6h
|
||||
- **Assignee**: Emanuel Almeida
|
||||
- **Dependencies**: T012
|
||||
- **Acceptance**: Download reports in multiple formats
|
||||
### 🎯 PARALLEL EXECUTION GROUPS
|
||||
**Group A [P]**: T004, T005, T006 (Environment & Namespace fixes)
|
||||
**Group B [P]**: T007, T008, T009 (Structure & Compliance)
|
||||
|
||||
### 🧪 TESTING & QA TASKS
|
||||
|
||||
#### T014: Frontend Testing Suite (Priority: HIGH)
|
||||
- [ ] **Selenium UI Tests**: Core user journeys
|
||||
- **Estimate**: 10h
|
||||
- **Dependencies**: T001-T013 completed
|
||||
- **Acceptance**: Automated browser tests passing
|
||||
|
||||
- [ ] **JavaScript Unit Tests**: Client-side functionality
|
||||
- **Estimate**: 6h
|
||||
- **Dependencies**: T003, T004, T006
|
||||
- **Acceptance**: 90%+ JS code coverage
|
||||
|
||||
- [ ] **Integration Testing**: API endpoints
|
||||
- **Estimate**: 8h
|
||||
- **Dependencies**: All backend tasks
|
||||
- **Acceptance**: All endpoints tested with various scenarios
|
||||
|
||||
#### T015: Performance & Security Testing (Priority: HIGH)
|
||||
- [ ] **Load Testing**: Concurrent user simulation
|
||||
- **Estimate**: 4h
|
||||
- **Dependencies**: T001-T013 completed
|
||||
- **Acceptance**: Handle 50+ concurrent users
|
||||
|
||||
- [ ] **Security Audit**: OWASP compliance check
|
||||
- **Estimate**: 6h
|
||||
- **Dependencies**: T002, T005
|
||||
- **Acceptance**: No critical vulnerabilities found
|
||||
|
||||
- [ ] **Cross-browser Testing**: Compatibility verification
|
||||
- **Estimate**: 4h
|
||||
- **Dependencies**: UI tasks completed
|
||||
- **Acceptance**: Works on Chrome, Firefox, Safari, Edge
|
||||
|
||||
### 🚀 DEPLOYMENT & INFRASTRUCTURE
|
||||
|
||||
#### T016: Production Deployment (Priority: HIGH)
|
||||
- [ ] **Environment Setup**: Production server configuration
|
||||
- **Estimate**: 6h
|
||||
- **Dependencies**: All development tasks
|
||||
- **Acceptance**: Production environment ready
|
||||
|
||||
- [ ] **CI/CD Pipeline**: Automated deployment
|
||||
- **Estimate**: 8h
|
||||
- **Dependencies**: T016
|
||||
- **Acceptance**: Automated testing and deployment
|
||||
|
||||
- [ ] **Monitoring Setup**: Application observability
|
||||
- **Estimate**: 4h
|
||||
- **Dependencies**: T016
|
||||
- **Acceptance**: Logs, metrics, and alerts configured
|
||||
### 🔄 EXECUTION SEQUENCE
|
||||
```
|
||||
T001 → T002 → T003 → [T004, T005, T006] → [T007, T008, T009] → T010 → T011 → T012 → T013
|
||||
```
|
||||
|
||||
## 📊 SPRINT SUMMARY
|
||||
|
||||
### Sprint Metrics
|
||||
- **Total Tasks**: 16
|
||||
- **Total Estimated Hours**: 98h
|
||||
- **Average Task Size**: 6.1h
|
||||
- **Sprint Duration**: 3-4 weeks
|
||||
- **Team Size**: 1 developer
|
||||
- **Total Tasks**: 13
|
||||
- **Total Estimated Time**: ~127 minutes (2.1 hours)
|
||||
- **Average Task Size**: 9.8 minutes
|
||||
- **Sprint Duration**: 1 day (same-day completion)
|
||||
- **Team Size**: Automated agent orchestration
|
||||
|
||||
### Task Distribution
|
||||
```
|
||||
Priority HIGH: 10 tasks (62.5%)
|
||||
Priority MEDIUM: 6 tasks (37.5%)
|
||||
Priority LOW: 0 tasks (0%)
|
||||
Priority CRITICAL: 2 tasks (15.4%) - Syntax fixes
|
||||
Priority HIGH: 6 tasks (46.2%) - Environment & validation
|
||||
Priority MEDIUM: 4 tasks (30.8%) - Structure & compliance
|
||||
Priority LOW: 1 task (7.7%) - Version update
|
||||
```
|
||||
|
||||
Frontend Focus: 8 tasks (50%)
|
||||
Backend Focus: 5 tasks (31.25%)
|
||||
Testing Focus: 3 tasks (18.75%)
|
||||
### Phase Distribution
|
||||
```
|
||||
Phase 1 (Critical): 3 tasks - 30 min (23.6%)
|
||||
Phase 2 (Environment): 3 tasks - 50 min (39.4%)
|
||||
Phase 3 (Structure): 3 tasks - 22 min (17.3%)
|
||||
Phase 4 (Validation): 4 tasks - 40 min (31.5%)
|
||||
```
|
||||
|
||||
### Agent Specialization
|
||||
```
|
||||
php-fullstack-engineer: T001, T005, T008 (PHP expertise)
|
||||
dev-helper: T002, T006, T009, T011 (General development)
|
||||
development-lead: T003, T010 (Architecture & validation)
|
||||
system-development-agent: T004, T007 (Infrastructure)
|
||||
security-compliance-specialist: T012 (Production compliance)
|
||||
content-manager: T013 (Documentation)
|
||||
```
|
||||
|
||||
### Dependencies Map
|
||||
```
|
||||
T001 → T002 → T003 → T004, T008, T010, T011
|
||||
→ T005 → T006, T007, T009
|
||||
T011 → T012 → T013
|
||||
All Dev Tasks → T014, T015 → T016
|
||||
T001 → T002 → T003
|
||||
T003 → [T004, T005, T006] (Parallel Group A)
|
||||
T003 → [T007, T008, T009] (Parallel Group B)
|
||||
[T004-T009] → T010 → T011 → T012 → T013
|
||||
```
|
||||
|
||||
## 🔄 WORKFLOW INTEGRATION
|
||||
## 🎯 EXECUTION STRATEGY
|
||||
|
||||
### Daily Workflow
|
||||
1. **Morning**: Review failed syncs, check dashboards
|
||||
2. **Development**: Focus on current sprint tasks
|
||||
3. **Testing**: Continuous testing of implemented features
|
||||
4. **Evening**: Deploy to staging, update task status
|
||||
### Parallel Optimization
|
||||
- **Phase 2**: 3 tasks in parallel (saves 35 minutes)
|
||||
- **Phase 3**: 3 tasks in parallel (saves 20 minutes)
|
||||
- **Total parallelization savings**: 55 minutes
|
||||
|
||||
### Weekly Milestones
|
||||
- **Week 1**: Dashboard and authentication (T001-T004)
|
||||
- **Week 2**: Configuration interfaces (T005-T007)
|
||||
- **Week 3**: Error management and reports (T008-T013)
|
||||
- **Week 4**: Testing and deployment (T014-T016)
|
||||
### Quality Gates
|
||||
1. **Syntax validation** after each PHP fix
|
||||
2. **PHPStan analysis** after all syntax fixes
|
||||
3. **Extension check** after environment setup
|
||||
4. **Final validation** with all tools integrated
|
||||
|
||||
### Definition of Done
|
||||
- [ ] Code implemented and tested
|
||||
- [ ] Unit tests written and passing
|
||||
- [ ] Integration tests passing
|
||||
- [ ] UI/UX reviewed and approved
|
||||
- [ ] Documentation updated
|
||||
- [ ] Security review completed
|
||||
- [ ] Performance verified
|
||||
- [ ] Deployed to staging
|
||||
- [ ] User acceptance confirmed
|
||||
### Success Criteria
|
||||
- ✅ **Zero PHPStan syntax errors**
|
||||
- ✅ **PHPUnit executes without extension errors**
|
||||
- ✅ **Production readiness validator: PASS**
|
||||
- ✅ **All files comply with PSR-4**
|
||||
- ✅ **Required directory structure exists**
|
||||
|
||||
---
|
||||
|
||||
**Version**: 1.1 | **Last Update**: 2025-09-12 23:30 | **Sprint**: Phase 2 Web Interface - PHP 8.4 Ready
|
||||
**Version**: 2.0 | **Last Update**: 2025-09-13 01:33 | **Sprint**: Quality Assurance & Production Readiness
|
||||
Reference in New Issue
Block a user