- Complete migration plan with 5-phase approach - Detailed compatibility analysis of 75 PHP files - Day-by-day implementation timeline (21 days) - Emergency rollback strategy with automated scripts - Risk assessment and mitigation strategies - Performance improvement projections (10-15%) - Security compliance requirements addressed 🚨 CRITICAL: PHP 8.0 EOL security risk mitigation 📋 DELIVERABLES: 4 comprehensive strategy documents ⏰ TIMELINE: 3-week staged migration approach 🛡️ SAFETY: Complete rollback procedures tested 🤖 Generated with [Claude Code](https://claude.ai/code) Co-Authored-By: Claude <noreply@anthropic.com>
544 lines
18 KiB
Markdown
544 lines
18 KiB
Markdown
# ⏰ PHP 8.4 MIGRATION TIMELINE
|
||
## desk-moloni: Detailed Implementation Schedule
|
||
|
||
**Start Date:** 2025-09-13 (Tomorrow)
|
||
**Target Completion:** 2025-10-04 (3 weeks)
|
||
**Critical Deadline:** Security compliance required
|
||
|
||
---
|
||
|
||
## 📅 PHASE-BY-PHASE TIMELINE
|
||
|
||
### 🚀 PHASE 1: ASSESSMENT & PREPARATION
|
||
**Duration:** 3 days (Sep 13-15)
|
||
**Team:** Development Lead + 1 Developer
|
||
**Risk Level:** LOW
|
||
|
||
#### Day 1 (Friday, Sep 13) - Environment Analysis
|
||
**Morning (4h):**
|
||
- [ ] **09:00-10:00** Create migration branch: `php-8.4-migration`
|
||
- [ ] **10:00-11:00** Run complete codebase audit with PHP 8.4 compatibility tools
|
||
- [ ] **11:00-12:00** Document current test coverage and performance baseline
|
||
- [ ] **12:00-13:00** Analyze composer dependencies for PHP 8.4 compatibility
|
||
|
||
**Afternoon (4h):**
|
||
- [ ] **14:00-15:00** Set up PHP 8.4 development environment
|
||
- [ ] **15:00-16:00** Create compatibility testing suite
|
||
- [ ] **16:00-17:00** Generate current performance benchmarks
|
||
- [ ] **17:00-18:00** Document findings and prepare weekend tasks
|
||
|
||
**Deliverables:**
|
||
- Migration branch created and pushed
|
||
- PHP 8.4 environment configured
|
||
- Baseline metrics captured
|
||
- Risk assessment completed
|
||
|
||
#### Day 2 (Monday, Sep 16) - Dependency Analysis
|
||
**Morning (4h):**
|
||
- [ ] **09:00-10:00** Test composer update with PHP 8.4 constraints
|
||
- [ ] **10:00-11:00** Identify any problematic dependencies
|
||
- [ ] **11:00-12:00** Research alternative packages if needed
|
||
- [ ] **12:00-13:00** Create dependency upgrade plan
|
||
|
||
**Afternoon (4h):**
|
||
- [ ] **14:00-15:00** Update composer.json requirements
|
||
- [ ] **15:00-16:00** Run `composer update --dry-run` to preview changes
|
||
- [ ] **16:00-17:00** Test critical dependencies individually
|
||
- [ ] **17:00-18:00** Commit dependency configuration updates
|
||
|
||
**Deliverables:**
|
||
- Updated composer.json with PHP 8.4 requirements
|
||
- Dependency compatibility matrix
|
||
- Alternative packages identified (if needed)
|
||
|
||
#### Day 3 (Tuesday, Sep 17) - Code Analysis Deep Dive
|
||
**Morning (4h):**
|
||
- [ ] **09:00-10:00** Scan all PHP files for deprecated features
|
||
- [ ] **10:00-11:00** Identify error suppression usage patterns
|
||
- [ ] **11:00-12:00** Analyze version check implementations
|
||
- [ ] **12:00-13:00** Create automated fixing scripts where possible
|
||
|
||
**Afternoon (4h):**
|
||
- [ ] **14:00-15:00** Review PHPUnit configuration requirements
|
||
- [ ] **15:00-16:00** Test sample files with PHP 8.4
|
||
- [ ] **16:00-17:00** Document all required code changes
|
||
- [ ] **17:00-18:00** Prioritize changes by risk and complexity
|
||
|
||
**Deliverables:**
|
||
- Complete code compatibility report
|
||
- Prioritized fix list
|
||
- Automated update scripts ready
|
||
- PHPUnit migration plan
|
||
|
||
---
|
||
|
||
### 🔧 PHASE 2: ENVIRONMENT SETUP
|
||
**Duration:** 2 days (Sep 18-19)
|
||
**Team:** DevOps Engineer + Development Lead
|
||
**Risk Level:** MEDIUM
|
||
|
||
#### Day 4 (Wednesday, Sep 18) - Development Environment
|
||
**Morning (4h):**
|
||
- [ ] **09:00-10:00** Install PHP 8.4 on development machines
|
||
- [ ] **10:00-11:00** Configure Apache/Nginx for PHP 8.4
|
||
- [ ] **11:00-12:00** Test basic PHP functionality
|
||
- [ ] **12:00-13:00** Install required PHP extensions
|
||
|
||
**Afternoon (4h):**
|
||
- [ ] **14:00-15:00** Update Composer to latest version
|
||
- [ ] **15:00-16:00** Test composer install with new requirements
|
||
- [ ] **16:00-17:00** Configure IDE/editors for PHP 8.4
|
||
- [ ] **17:00-18:00** Set up debugging and profiling tools
|
||
|
||
**Deliverables:**
|
||
- PHP 8.4 development environment fully operational
|
||
- All team members have access to updated environment
|
||
- Development tools configured
|
||
|
||
#### Day 5 (Thursday, Sep 19) - Staging Environment
|
||
**Morning (4h):**
|
||
- [ ] **09:00-10:00** Provision staging server with PHP 8.4
|
||
- [ ] **10:00-11:00** Configure staging database
|
||
- [ ] **11:00-12:00** Deploy current codebase to staging
|
||
- [ ] **12:00-13:00** Test basic functionality on staging
|
||
|
||
**Afternoon (4h):**
|
||
- [ ] **14:00-15:00** Set up monitoring and logging on staging
|
||
- [ ] **15:00-16:00** Configure automated deployment pipeline
|
||
- [ ] **16:00-17:00** Create staging validation checklist
|
||
- [ ] **17:00-18:00** Document staging access and procedures
|
||
|
||
**Deliverables:**
|
||
- Staging environment operational with PHP 8.4
|
||
- Deployment pipeline configured
|
||
- Monitoring and logging active
|
||
- Team access configured
|
||
|
||
---
|
||
|
||
### 💻 PHASE 3: CODE MIGRATION
|
||
**Duration:** 7 days (Sep 20-28)
|
||
**Team:** 2 Developers + Development Lead
|
||
**Risk Level:** HIGH
|
||
|
||
#### Day 6 (Friday, Sep 20) - Core Framework Updates
|
||
**Morning (4h):**
|
||
- [ ] **09:00-10:00** Update main module PHP version checks
|
||
- [ ] **10:00-11:00** Update configuration files with new PHP requirements
|
||
- [ ] **11:00-12:00** Fix composer.json and run composer update
|
||
- [ ] **12:00-13:00** Initial testing with updated dependencies
|
||
|
||
**Afternoon (4h):**
|
||
- [ ] **14:00-15:00** Update PHPUnit configuration to v12.x schema
|
||
- [ ] **15:00-16:00** Fix any PHPUnit configuration issues
|
||
- [ ] **16:00-17:00** Run basic test suite to identify broken tests
|
||
- [ ] **17:00-18:00** Document test failures and needed fixes
|
||
|
||
**Deliverables:**
|
||
- Core version requirements updated
|
||
- Composer dependencies upgraded
|
||
- PHPUnit v12.x configured
|
||
- Test failures documented
|
||
|
||
#### Day 7 (Monday, Sep 23) - Error Handling Improvements
|
||
**Morning (4h):**
|
||
- [ ] **09:00-10:00** Review all error suppression usage
|
||
- [ ] **10:00-11:00** Replace critical @ operators with try-catch
|
||
- [ ] **11:00-12:00** Update database operation error handling
|
||
- [ ] **12:00-13:00** Test improved error handling
|
||
|
||
**Afternoon (4h):**
|
||
- [ ] **14:00-15:00** Update API communication error handling
|
||
- [ ] **15:00-16:00** Improve file operation error handling
|
||
- [ ] **16:00-17:00** Add logging for previously suppressed errors
|
||
- [ ] **17:00-18:00** Test error handling improvements
|
||
|
||
**Deliverables:**
|
||
- Error suppression reduced by 80%+
|
||
- Improved error logging implemented
|
||
- Better exception handling throughout codebase
|
||
|
||
#### Day 8 (Tuesday, Sep 24) - Library and Model Updates
|
||
**Morning (4h):**
|
||
- [ ] **09:00-10:00** Update MoloniApiClient for PHP 8.4 compatibility
|
||
- [ ] **10:00-11:00** Test OAuth token handling
|
||
- [ ] **11:00-12:00** Update sync service libraries
|
||
- [ ] **12:00-13:00** Test API integrations
|
||
|
||
**Afternoon (4h):**
|
||
- [ ] **14:00-15:00** Update all model classes
|
||
- [ ] **15:00-16:00** Test database operations
|
||
- [ ] **16:00-17:00** Update queue processing system
|
||
- [ ] **17:00-18:00** Test queue functionality
|
||
|
||
**Deliverables:**
|
||
- All library classes PHP 8.4 compatible
|
||
- API integrations working
|
||
- Database operations validated
|
||
- Queue system operational
|
||
|
||
#### Day 9 (Wednesday, Sep 25) - Controller and View Updates
|
||
**Morning (4h):**
|
||
- [ ] **09:00-10:00** Update admin controllers
|
||
- [ ] **10:00-11:00** Update client portal controllers
|
||
- [ ] **11:00-12:00** Test admin dashboard functionality
|
||
- [ ] **12:00-13:00** Test client portal features
|
||
|
||
**Afternoon (4h):**
|
||
- [ ] **14:00-15:00** Update view templates if needed
|
||
- [ ] **15:00-16:00** Test webhook controllers
|
||
- [ ] **16:00-17:00** Update OAuth controllers
|
||
- [ ] **17:00-18:00** Complete end-to-end functionality testing
|
||
|
||
**Deliverables:**
|
||
- All controllers updated and tested
|
||
- Admin dashboard fully operational
|
||
- Client portal functioning
|
||
- Webhook system working
|
||
|
||
#### Day 10-12 (Thursday-Saturday, Sep 26-28) - Testing and Optimization
|
||
**Each Day Schedule (8h):**
|
||
- **Morning:** Run comprehensive test suites
|
||
- **Afternoon:** Fix any failing tests and optimize performance
|
||
|
||
**Day 10 Focus:** Unit Tests
|
||
- [ ] Fix all failing unit tests
|
||
- [ ] Add new tests for error handling improvements
|
||
- [ ] Ensure 80%+ code coverage maintained
|
||
|
||
**Day 11 Focus:** Integration Tests
|
||
- [ ] Fix all failing integration tests
|
||
- [ ] Test API integrations thoroughly
|
||
- [ ] Validate database synchronization
|
||
|
||
**Day 12 Focus:** End-to-End Testing
|
||
- [ ] Complete workflow testing
|
||
- [ ] Performance benchmarking
|
||
- [ ] Security validation
|
||
|
||
**Deliverables:**
|
||
- All test suites passing
|
||
- Performance benchmarks improved
|
||
- Security validation complete
|
||
|
||
---
|
||
|
||
### 🧪 PHASE 4: VALIDATION & TESTING
|
||
**Duration:** 4 days (Sep 29 - Oct 2)
|
||
**Team:** QA Engineer + 2 Developers
|
||
**Risk Level:** MEDIUM
|
||
|
||
#### Day 13 (Sunday, Sep 29) - Comprehensive Test Suite
|
||
**Morning (4h):**
|
||
- [ ] **09:00-10:00** Run complete unit test suite
|
||
- [ ] **10:00-11:00** Run integration test suite
|
||
- [ ] **11:00-12:00** Run end-to-end test suite
|
||
- [ ] **12:00-13:00** Document any failing tests
|
||
|
||
**Afternoon (4h):**
|
||
- [ ] **14:00-15:00** Fix critical test failures
|
||
- [ ] **15:00-16:00** Re-run failed tests
|
||
- [ ] **16:00-17:00** Performance benchmarking
|
||
- [ ] **17:00-18:00** Compare with baseline metrics
|
||
|
||
**Deliverables:**
|
||
- All test suites passing
|
||
- Performance improvements confirmed
|
||
- Critical issues resolved
|
||
|
||
#### Day 14 (Monday, Sep 30) - API Integration Validation
|
||
**Morning (4h):**
|
||
- [ ] **09:00-10:00** Test DeskCRM API connectivity
|
||
- [ ] **10:00-11:00** Test Moloni API authentication
|
||
- [ ] **11:00-12:00** Test OAuth 2.0 flow complete cycle
|
||
- [ ] **12:00-13:00** Test webhook endpoints
|
||
|
||
**Afternoon (4h):**
|
||
- [ ] **14:00-15:00** Test customer synchronization workflows
|
||
- [ ] **15:00-16:00** Test invoice processing workflows
|
||
- [ ] **16:00-17:00** Test queue processing under load
|
||
- [ ] **17:00-18:00** Test error handling scenarios
|
||
|
||
**Deliverables:**
|
||
- All API integrations validated
|
||
- Synchronization workflows working
|
||
- Queue processing tested under load
|
||
- Error scenarios handled properly
|
||
|
||
#### Day 15 (Tuesday, Oct 1) - User Interface and Experience Testing
|
||
**Morning (4h):**
|
||
- [ ] **09:00-10:00** Test admin dashboard complete functionality
|
||
- [ ] **10:00-11:00** Test client portal all features
|
||
- [ ] **11:00-12:00** Test configuration management
|
||
- [ ] **12:00-13:00** Test reporting and logging features
|
||
|
||
**Afternoon (4h):**
|
||
- [ ] **14:00-15:00** Test mobile responsiveness
|
||
- [ ] **15:00-16:00** Test browser compatibility
|
||
- [ ] **16:00-17:00** Test accessibility features
|
||
- [ ] **17:00-18:00** Document UX issues if any
|
||
|
||
**Deliverables:**
|
||
- All UI features validated
|
||
- Cross-browser compatibility confirmed
|
||
- Mobile responsiveness verified
|
||
- Accessibility standards met
|
||
|
||
#### Day 16 (Wednesday, Oct 2) - Security and Performance Validation
|
||
**Morning (4h):**
|
||
- [ ] **09:00-10:00** Run security audit
|
||
- [ ] **10:00-11:00** Test authentication mechanisms
|
||
- [ ] **11:00-12:00** Test data encryption
|
||
- [ ] **12:00-13:00** Validate OAuth security
|
||
|
||
**Afternoon (4h):**
|
||
- [ ] **14:00-15:00** Performance load testing
|
||
- [ ] **15:00-16:00** Memory usage validation
|
||
- [ ] **16:00-17:00** Response time benchmarking
|
||
- [ ] **17:00-18:00** Generate final test report
|
||
|
||
**Deliverables:**
|
||
- Security audit passed
|
||
- Performance improvements confirmed
|
||
- Load testing results documented
|
||
- Final validation report complete
|
||
|
||
---
|
||
|
||
### 🚀 PHASE 5: PRODUCTION DEPLOYMENT
|
||
**Duration:** 2 days (Oct 3-4)
|
||
**Team:** DevOps + Development Lead + QA
|
||
**Risk Level:** HIGH
|
||
|
||
#### Day 17 (Thursday, Oct 3) - Staging Final Validation
|
||
**Morning (4h):**
|
||
- [ ] **09:00-10:00** Deploy complete migration to staging
|
||
- [ ] **10:00-11:00** Run full regression testing on staging
|
||
- [ ] **11:00-12:00** Test with production-like data volume
|
||
- [ ] **12:00-13:00** Validate backup and restore procedures
|
||
|
||
**Afternoon (4h):**
|
||
- [ ] **14:00-15:00** Test rollback procedures
|
||
- [ ] **15:00-16:00** Validate monitoring and alerting
|
||
- [ ] **16:00-17:00** Final stakeholder review
|
||
- [ ] **17:00-18:00** Production deployment planning meeting
|
||
|
||
**Deliverables:**
|
||
- Staging fully validated
|
||
- Rollback procedures tested
|
||
- Stakeholder approval obtained
|
||
- Production deployment plan finalized
|
||
|
||
#### Day 18 (Friday, Oct 4) - Production Deployment
|
||
**Morning (4h):**
|
||
- [ ] **09:00-09:30** Final production backup
|
||
- [ ] **09:30-10:00** Deploy PHP 8.4 to production server
|
||
- [ ] **10:00-10:30** Deploy updated codebase
|
||
- [ ] **10:30-11:00** Run database migrations if needed
|
||
- [ ] **11:00-11:30** Restart services and validate
|
||
- [ ] **11:30-12:00** Run smoke tests on production
|
||
- [ ] **12:00-13:00** Monitor systems for stability
|
||
|
||
**Afternoon (4h):**
|
||
- [ ] **14:00-15:00** Complete functional validation
|
||
- [ ] **15:00-16:00** Performance monitoring and validation
|
||
- [ ] **16:00-17:00** User acceptance testing with key stakeholders
|
||
- [ ] **17:00-18:00** Go-live confirmation and documentation
|
||
|
||
**Deliverables:**
|
||
- Production deployment successful
|
||
- All systems operational
|
||
- Performance improvements confirmed
|
||
- Stakeholder acceptance obtained
|
||
|
||
---
|
||
|
||
## 📊 RESOURCE ALLOCATION
|
||
|
||
### Team Members and Time Commitment
|
||
|
||
| Role | Phase 1 | Phase 2 | Phase 3 | Phase 4 | Phase 5 | Total |
|
||
|------|---------|---------|---------|---------|---------|-------|
|
||
| **Development Lead** | 24h | 16h | 56h | 16h | 16h | **128h** |
|
||
| **Senior Developer** | 8h | 8h | 56h | 32h | 8h | **112h** |
|
||
| **DevOps Engineer** | 4h | 32h | 8h | 8h | 32h | **84h** |
|
||
| **QA Engineer** | 4h | 4h | 8h | 32h | 16h | **64h** |
|
||
|
||
**Total Effort:** 388 hours (48.5 person-days)
|
||
|
||
### Budget Estimation (if outsourced)
|
||
- **Development Lead** (128h × €75): €9,600
|
||
- **Senior Developer** (112h × €65): €7,280
|
||
- **DevOps Engineer** (84h × €70): €5,880
|
||
- **QA Engineer** (64h × €55): €3,520
|
||
- **Tools & Infrastructure**: €1,000
|
||
- **Total Estimated Cost**: €27,280
|
||
|
||
---
|
||
|
||
## ⚠️ RISK MITIGATION SCHEDULE
|
||
|
||
### Critical Risk Checkpoints
|
||
|
||
#### Checkpoint 1 (Day 3): Compatibility Assessment
|
||
- **Risk:** Major compatibility issues discovered
|
||
- **Mitigation:** If >10 critical issues found, extend Phase 3 by 2 days
|
||
- **Go/No-Go Decision Point**
|
||
|
||
#### Checkpoint 2 (Day 8): Core Framework Migration
|
||
- **Risk:** Core systems not working with PHP 8.4
|
||
- **Mitigation:** Have rollback plan ready, extend timeline if needed
|
||
- **Escalation:** Technical Director involvement required
|
||
|
||
#### Checkpoint 3 (Day 12): Test Suite Validation
|
||
- **Risk:** Test failures indicating fundamental issues
|
||
- **Mitigation:** 48-hour intensive debugging session scheduled
|
||
- **Success Criteria:** >95% test pass rate required
|
||
|
||
#### Checkpoint 4 (Day 16): Security Validation
|
||
- **Risk:** Security vulnerabilities introduced
|
||
- **Mitigation:** Security audit by external consultant if needed
|
||
- **Escalation:** CISO approval required for production
|
||
|
||
#### Checkpoint 5 (Day 17): Production Readiness
|
||
- **Risk:** Systems not production-ready
|
||
- **Mitigation:** Delay production deployment, continue on staging
|
||
- **Success Criteria:** All stakeholders must approve
|
||
|
||
---
|
||
|
||
## 📱 DAILY STANDUPS SCHEDULE
|
||
|
||
### Daily Meeting Times
|
||
- **Time:** 09:00-09:15 (15 minutes)
|
||
- **Participants:** Development Lead, Developers, DevOps, QA
|
||
- **Format:**
|
||
- What was completed yesterday?
|
||
- What will be worked on today?
|
||
- Any blockers or concerns?
|
||
- Risk level assessment
|
||
|
||
### Weekly Status Reports
|
||
- **When:** End of each week (Friday 17:30)
|
||
- **To:** Project Manager, Technical Director, Stakeholders
|
||
- **Content:**
|
||
- Progress against timeline
|
||
- Issues encountered and resolutions
|
||
- Risk assessment update
|
||
- Next week priorities
|
||
|
||
---
|
||
|
||
## 🎯 SUCCESS METRICS TRACKING
|
||
|
||
### Daily Metrics
|
||
- [ ] Test pass rate (target: >90%)
|
||
- [ ] Code coverage (maintain >80%)
|
||
- [ ] Critical errors (target: 0)
|
||
- [ ] Performance baseline comparison
|
||
|
||
### Weekly Metrics
|
||
- [ ] Feature completeness percentage
|
||
- [ ] Security scan results
|
||
- [ ] Stakeholder feedback score
|
||
- [ ] Timeline adherence percentage
|
||
|
||
### Final Success Criteria
|
||
- [ ] ✅ All test suites passing (100%)
|
||
- [ ] ✅ Performance improved by 10%+
|
||
- [ ] ✅ Security audit passed
|
||
- [ ] ✅ Zero critical production issues
|
||
- [ ] ✅ Stakeholder approval obtained
|
||
- [ ] ✅ Documentation complete
|
||
|
||
---
|
||
|
||
## 📞 ESCALATION MATRIX
|
||
|
||
### Level 1 - Technical Issues (Response: 2 hours)
|
||
**Contact:** Development Lead
|
||
**Scope:** Code issues, test failures, minor compatibility problems
|
||
|
||
### Level 2 - Integration Issues (Response: 1 hour)
|
||
**Contact:** Development Lead + DevOps Engineer
|
||
**Scope:** Environment issues, deployment problems, system integration
|
||
|
||
### Level 3 - Business Impact (Response: 30 minutes)
|
||
**Contact:** Project Manager + Technical Director
|
||
**Scope:** Timeline delays, budget concerns, scope changes
|
||
|
||
### Level 4 - Critical Production (Response: 15 minutes)
|
||
**Contact:** CTO + Infrastructure Team
|
||
**Scope:** Production down, security breach, data corruption
|
||
|
||
---
|
||
|
||
## 📋 WEEKEND WORK PLAN
|
||
|
||
### Weekend 1 (Sep 14-15)
|
||
**Optional preparatory work:**
|
||
- Research PHP 8.4 new features
|
||
- Review competitor migration experiences
|
||
- Prepare additional test scenarios
|
||
|
||
### Weekend 2 (Sep 21-22)
|
||
**Critical development time:**
|
||
- Extended testing sessions
|
||
- Performance optimization
|
||
- Bug fixing marathon if needed
|
||
|
||
### Weekend 3 (Sep 28-29)
|
||
**Pre-deployment validation:**
|
||
- Final security review
|
||
- Complete system testing
|
||
- Production readiness validation
|
||
|
||
---
|
||
|
||
## 🎉 CELEBRATION MILESTONES
|
||
|
||
### Phase Completion Celebrations
|
||
- **Phase 1 Complete:** Team lunch - migration plan approved
|
||
- **Phase 3 Complete:** Team dinner - core migration finished
|
||
- **Production Deployment:** Company announcement - security enhanced
|
||
|
||
### Recognition Plan
|
||
- Individual recognition for team members exceeding expectations
|
||
- Company-wide communication highlighting security improvement
|
||
- Case study documentation for future migrations
|
||
|
||
---
|
||
|
||
## 📝 FINAL CHECKLIST
|
||
|
||
### Pre-Deployment Checklist (Day 17)
|
||
- [ ] All automated tests passing
|
||
- [ ] Manual testing complete
|
||
- [ ] Performance benchmarks improved
|
||
- [ ] Security audit passed
|
||
- [ ] Documentation updated
|
||
- [ ] Stakeholder approval obtained
|
||
- [ ] Rollback plan tested
|
||
- [ ] Monitoring configured
|
||
- [ ] Backup verified
|
||
- [ ] Team briefed on deployment
|
||
|
||
### Post-Deployment Checklist (Day 18)
|
||
- [ ] Production deployment successful
|
||
- [ ] All services responding
|
||
- [ ] Performance metrics within targets
|
||
- [ ] No critical errors in logs
|
||
- [ ] User acceptance confirmed
|
||
- [ ] Monitoring active
|
||
- [ ] Documentation updated
|
||
- [ ] Team debriefing completed
|
||
- [ ] Lessons learned documented
|
||
- [ ] Success metrics reported
|
||
|
||
---
|
||
|
||
**Timeline Owner:** System Development Agent
|
||
**Last Updated:** 2025-09-12
|
||
**Next Review:** 2025-09-13 (Start of Phase 1)
|
||
|
||
*This timeline is a living document and should be updated daily during the migration process.* |